So Saturday I started by framing and covering the back portion of the main deck.
Well technically, it isn't part of the deck but rather it will be a cannon chamber. With an opening leading to below deck.
I also built another ladder for this room but I'll eventually change it as this on doesn't have enough of an agnle built into it.
Yesterday I finished framing the cannon chamber as well as the doorway leading to the main deck. So structure wise, this thing I would say is 90% complete. I do now apparently have to find a way of squeezing in a brig in this thing though.
Covered the front part of the cannon chamber to straigten things out and as you can see, Mathieu is already burying treasure.
Today the most I may get done is to get the two 4X4s I need to finish the masts and braces for the rope bridge that'll go from the bridge to the crow's nest. Aside from that I really don't think we'll even get the tools out as it is another beautiful sunny day here and I think we may head to the beach after lunch.
Arghhh.
No comments:
Post a Comment